| Promoting Wholesale Competition Through Open Access Services by Public Utilities
Recovery of Stranded Costs by Public Utilities and Transmitting Utilities | Docket No. RM95-8-000 Docket No. RM94-7-001 |
The Commission has determined that non-discriminatory open access transmission services (including access to transmission information) and stranded cost recovery are the most critical components of a successful transition to competitive wholesale electricity markets. These issues are the focal point of this Rule, the accompanying rule on open access same-time information systems, and the accompanying proposed rule on capacity reservation tariffs.
In undertaking these initiatives, however, we are mindful that they are part of a broader picture of evolving issues affecting the electric industry and that other Commission policies will play an important role in ensuring the full development of competitive markets. Among the many issues that are important to competitive bulk power markets are: independent system operators (ISOs); regional transmission groups; generation market power; utility merger policy; and the development of innovative transmission pricing alternatives, such as flow-based, distance-sensitive transmission pricing methodologies that reflect incremental costs. In particular, we believe that ISOs have great potential to assist us and the industry to help provide regional efficiencies, to facilitate economically efficient pricing, and, especially in the context of power pools, to remedy undue discrimination and mitigate market power. Although we discuss some of these issues in this Rule, we will further develop our policies in other proceedings as well to accommodate and encourage more efficient market structures.
We now address the comments received on the scope of the proposed rulemaking.
In the NOPR, the Commission preliminarily found that functional unbundling of wholesale generation and transmission services is necessary to implement non-discriminatory open access transmission. 107/ At the same time, the Commission explained that the proposed rule would accommodate, but not require, corporate unbundling (which could include selling generation or transmission assets to a non-affiliate (divestiture) or the less aggressive step of establishing separate corporate affiliates to manage a utility's transmission and generation assets). However, we invited comments on functional unbundling and asked whether it is a strong enough measure to ensure non-discriminatory open access transmission without some form of corporate restructuring.
Commenters take both sides on whether functional unbundling is sufficient to assure non-discriminatory open access transmission or whether a stronger measure, such as corporate unbundling, is needed.
Various commenters, including utilities and state commissions, generally support functional unbundling as sufficient to assure non-discriminatory open access transmission and oppose requiring corporate unbundling or divestiture. 108/ Several commenters state that functional unbundling will remedy discrimination without creating the inefficiencies and additional costs that corporate restructuring would create. 109/
A number of other commenters argue that the Commission has no authority under the FPA to require divestiture of transmission assets. 110/ Several of these commenters assert that, even if the Commission has the authority, the electric industry, unlike the natural gas industry, is not ready for mandated corporate unbundling because electric utilities still serve a high percentage of retail customers and own large amounts of the generating capacity. They assert that transmission system operation requires the operator to have control over much of the generating capacity.
Various other commenters also support functional unbundling, but believe that safeguards are needed to make it work. 111/ Power Marketing Association, for example, suggests a number of safeguards: adoption of cost allocation mechanisms to ensure that utilities do not shift costs from generation to transmission; random audits of utility books; a requirement that each utility file a code of conduct that provides for maximum separation of generation and transmission functions; and active oversight and complaint procedures with strong penalties for abuse. OK Com and GA Com believe that functional unbundling along with the safeguard of the Commission's complaint process will provide sufficient incentive for non-discriminatory open access transmission.
A number of commenters see weaknesses in functional unbundling and argue that some form of corporate unbundling is necessary to assure non-discriminatory open access transmission. 112/ American Forest & Paper says that there is affiliate abuse in the gas industry and argues that the electric industry presents even more serious potential for abuse because it is still dominated by vertically integrated utilities. 113/ UAMPS asserts that functional unbundling is insufficient because the utility will still favor itself on issues related to transmission planning, capital investment, and operation and maintenance and replacement costs.
NIEP argues that divestiture of generation assets from transmission and distribution is the preferred mechanism for mitigating market power. It further suggests that if corporate divestiture is not feasible the Commission should
seek to achieve "virtual divestiture" by requiring that the utility generation function be separated from transmission and distribution functions in a separate corporate affiliate, or business unit, and that affiliate transaction rules be established to guard against possible abuses. [114/]
It maintains that the Commission has broad authority to protect against undue discrimination and anticompetitive behavior and can order divestiture if such action is required to remedy such behavior. 115/
FTC and DOJ argue that operational unbundling, an example of which is the formation of an independent system operator (ISO), likely would be more effective than functional unbundling and less costly than industry-wide divestiture. 116/ FTC describes operational unbundling as "structural institutional arrangements, short of divestiture, that would separate operation of the transmission grid and access to it from economic interests in generation." It gives as an example the California proposal under which utilities would continue to own transmission lines, but an independent system operator would have operational control. DOJ also suggests "a separate authority" to manage the grid and access to the grid, joint ventures, and voluntary pooling arrangements. These commenters argue that operational unbundling would be easier to enforce than functional unbundling.
DOE states that separation of the control of transmission from vertically-integrated companies does not necessarily require a poolco or any particular market mechanism. It suggests the possibility of an ISO that is functionally separate from any buyer or seller of generation, but would not perform all the functions of a poolco.
United Illuminating supports "operational unbundling" that would either (1) eliminate vertical integration and divestiture of transmission assets, leading to the formation of a regional transmission company, or (2) develop a regional contractual approach to transmission services that eliminates the transmission owner's market power and fairly allocates support of the transmission facilities between native load and third-party users of the system.
We conclude that functional unbundling of wholesale services is necessary to implement non-discriminatory open access transmission and that corporate unbundling should not now be required. As we explained in the NOPR, functional unbundling means three things:
We believe that these requirements are necessary to ensure that public utilities provide non-discriminatory service. 117/ These requirements also will give public utilities an incentive to file fair and efficient rates, terms, and conditions, since they will be subject to those same rates, terms, and conditions.
However, we recognize that additional safeguards are necessary to protect against market power abuses. Functional unbundling will work only if a strong code of conduct (including a requirement to separate employees involved in transmission functions from those involved in wholesale power merchant functions) is in place. In the RINs NOPR, the Commission proposed a code of conduct that would apply to all public utility transmission providers. As the Commission explained,
[t]his code of conduct would require, among other matters, a separation of the utilities' transmission system operations and wholesale marketing functions, and would define permissible and impermissible contacts between employees that conduct wholesale generation marketing functions and employees that handle transmission system operations and reliability in the system control center or at other facilities or locations. 118/
Adoption of this code of conduct, discussed in detail in the accompanying final rule on OASIS, 119/ is needed to ensure that the transmission owner's wholesale marketing personnel and the transmission customer's marketing personnel have comparable access to information about the transmission system.
As noted by OK Com and GA Com, a further safeguard -- section 206 -- is available if a public utility seeks to circumvent the functional unbundling requirements. Under section 206, any person is free to file a complaint with the Commission detailing any alleged misbehavior on the part of the public utility or its affiliates concerning matters subject to our jurisdiction under the FPA. Similarly, the Commission may, on its own motion, initiate a proceeding to investigate the practices of the public utility and its affiliates.
We believe that functional unbundling, coupled with these safeguards, is a reasonable and workable means of assuring that non-discriminatory open access transmission occurs. In the absence of evidence that functional unbundling will not work, we are not prepared to adopt a more intrusive and potentially more costly mechanism -- corporate unbundling -- at this time.
Several commenters discuss the need to encourage or even to require ISOs in the context of functional unbundling. We believe that ISOs have the potential to provide significant benefits (e.g., to help provide regional efficiencies, to facilitate economically efficient pricing, and, especially in the context of power pools, to remedy undue discrimination and mitigate market power) and will further our goal of achieving a workably competitive market. As we learned at our technical conference on power pools, many utilities are examining ISOs and corporate unbundling in various shapes and forms, particularly in the context of power pools. We discuss ISOs extensively in our section on power pools where we believe they will have an important role to play. However, in the context of individual utility transactions, we believe that the less intrusive functional unbundling approach outlined above is all that we must require at this time. Nevertheless, we see many benefits in ISOs, and encourage utilities to consider ISOs as a tool to meet the demands of the competitive marketplace.
As a further precaution against discriminatory behavior, we will continue to monitor electricity markets to ensure that functional unbundling adequately protects transmission customers. At the same time, we will analyze all alternative proposals, including formation of ISOs, and, if it becomes apparent that functional unbundling is inadequate or unworkable in assuring non-discriminatory open access transmission, we will reevaluate our position and decide whether other mechanisms, such as ISOs, should be required.
Finally, while we are not now requiring any form of corporate unbundling, we again encourage utilities to explore whether corporate unbundling or other restructuring mechanisms may be appropriate in particular circumstances. Thus, we intend to accommodate other mechanisms that public utilities may submit, including voluntary corporate restructurings (e.g., ISOs, separate corporate divisions, divestiture, poolcos), to ensure that open access transmission occurs on a non-discriminatory basis. We also will continue to monitor -- and stand ready to work with parties engaging in -- innovative restructuring proposals occurring around the country.
In the NOPR, the Commission proposed to codify its determination in Kansas City Power & Light Company 120/ that the generation dominance standard for market-based sales from new capacity be dropped. 121/ The proposed new section 35.27 would provide:
Notwithstanding any other requirements, any public utility seeking authorization to engage in sales for resale of electric energy at market-based rates shall not be required to demonstrate any lack of market power in generation with respect to sales from capacity first placed in service on or after [INSERT DATE 30 DAYS AFTER THE FINAL RULE IS PUBLISHED IN THE FEDERAL REGISTER]. [122/]
However, this proposal would not affect the Commission's continuing authority to look at whether an applicant and its affiliates could erect other barriers to entry and whether there may be affiliate abuse or reciprocal dealing. 123/
A number of commenters support the Commission's determination in KCP&L 124/ and several of them explicitly support the Commission's proposed codification. 125/ EEI asserts that more than 50 percent of new generation is from non- utility sources and that recent competitive solicitations for new capacity have been greatly over-subscribed. Entergy argues that there is no evidence in any proceeding thus far of a market power problem in long-run markets.
Other commenters, however, oppose codifying KCP&L. 126/ They believe that market power in long-run markets exists for both new and old generation due to, for example, constraints on interface capabilities and unduly long notice periods for replacement of purchases. They argue that there is not enough of a distinction between new and old generation to treat them differently. TDU Systems also notes that the Commission in KCP&L did not take into account the differences between firm and non- firm bulk power. NIEP and ELCON conclude that the Commission erroneously found in KCP&L that no wholesale seller of generation has market power in generation from new facilities. NIEP asserts that in each service area there is usually only one wholesale buyer -- the utility -- who also is virtually always a wholesale seller of generation. Under these circumstances, NIEP argues that there cannot be arm's-length bargaining. Environmental Action complains that the Commission's proposal to codify KCP&L ignores significant factors that impede entry to generation markets, such as utility resistance to purchased power, state government-created barriers to non-utility generation, pancaking of rates under the contract path approach, sunk investment, and scale economies.
In reviewing applications to sell at market-based rates, whether from new (unbuilt) capacity or existing capacity, we require that the seller (and each of its affiliates) must not have, or must have mitigated, market power in generation and transmission and not control other barriers to entry. In order to demonstrate the requisite absence or mitigation of transmission market power, a transmission-owning public utility seeking to sell at market-based rates must have on file with the Commission an open access transmission tariff for the provision of comparable service. In addition, the Commission considers whether there is evidence of affiliate abuse or reciprocal dealing. 127/
In KCP&L, we stated that "in light of industry and statutory changes which allow ease of market entry, we therefore will no longer require rate applicants to submit evidence of generation dominance in long-run bulk power markets." 128/ We further explained that we had examined "generation dominance in many different cases over the years" and had "yet to find an instance of generation dominance in long-run bulk power markets." 129/ Commenters have criticized our findings in KCP&L, but no commenter has provided any evidence of generation dominance in long-run bulk power markets. Moreover, we have seen no such evidence in any of the market-based rate cases we have considered since KCP&L. Based on the comments received, we will codify the Commission's determination in KCP&L that the generation dominance standard for market-based sales from new capacity should be dropped. Because the Commission's findings in KCP&L applied to long-run markets, we will revise proposed section 35.27 to apply to sales from capacity for which construction has commenced on or after the effective date of this Rule. 130/
The Commission wishes to clarify that dropping the generation dominance standard for new capacity does not affect the demonstration that an applicant must make in order to qualify for market-based rates for sales from its existing generating capacity. In other words, the fact that an applicant need not demonstrate its lack of generation dominance with respect to new capacity cannot be used to "bootstrap" the authorization of market-based rates for its existing capacity. Moreover, our evaluation of market-based rates for existing capacity will include consideration of new capacity.
In addition, the fact that we are codifying KCP&L does not mean that we will ignore specific evidence presented by an intervenor that a seller requesting market-based rates for sales from new generation nevertheless possesses generation dominance. For example, if the evidence indicated that the new generator, due to its proximity to an existing transmission constraint, could significantly influence the ability to move power across the constraint, we would consider such evidence in determining whether to grant the applicant's request. 131/ If such evidence is presented, the Commission will evaluate whether the evidence disproves the premise that the seller lacks generation dominance with respect to its new capacity.
If the applicant has existing generation, the sales from which are authorized to be made on a market basis, the Commission would consider whether the new generation (when added to the existing generation with market-based authority) results in the applicant having generation dominance. On the other hand, if the applicant has existing generation, the sales from which are subject to cost-of-service regulation, the Commission would not include this generation in its analysis of the applicant's request for market-based rates for its new generation. The question of whether or not the applicant lacks generation dominance with respect to its existing capacity is relevant only if, and when, the seller applies to the Commission for authority to make wholesale sales for its existing capacity at market-based rates.
If evidence regarding an applicant's generation dominance with respect to its new capacity is submitted, the applicant would be required to provide a satisfactory rebuttal.
In the NOPR, the Commission explained that increased competition resulting from open access transmission may reduce or even eliminate generation-related market power in the short-run market (sales from existing capacity). 132/ Because market power has been the primary concern of the Commission in analyzing requests for market-based rates for such sales, we sought comments on the effect of industry-wide non-discriminatory open access on our criteria for authorizing power sales at market- based rates. The Commission also sought comments on whether the generation dominance standard should be dropped for market-based sales from existing capacity.
Many commenters support, but many also oppose, market-based rates for existing generation without a case-specific analysis of generation dominance.
Many commenters (primarily IOUs and a number of state commissions) assert that existing generators will not possess market power after implementation of non-discriminatory open access transmission and that market-based rates should be permitted generically for sales from existing generation. 133/
EEI asserts that market power concerns generally would be transitory, limited to the time needed to build new facilities. Thus, it recommends that all markets be declared competitive by a date certain and that market-based rates then be allowed, with customers permitted to file complaints. Florida Power Corp believes that existing procedures under sections 205 and 206 will adequately protect consumers. Other commenters also urge the Commission to eliminate its generation dominance standard, but assert that the Commission should allow a showing of market dominance in a complaint or show cause proceeding. 134/ CT DPUC notes that the Commission should be able to rely on rules of conduct, market mechanisms, and monitoring to curb any market power that may exist.
Utilities For Improved Transition argues that if utilities cannot get market-based rates, the new players in the market will have an unfair advantage, since they do not have to carry the traditional utilities' burden of older, less efficient plants.
Entergy proposes a screening test that would permit the Commission to "deregulate" wholesale sales to certain short-run markets. CINergy recommends that after industry-wide open access tariffs become effective, the Commission adopt a rebuttable presumption that all markets are workably competitive; that presumption could be rebutted in a section 206 proceeding. 135/
UtiliCorp, while it believes that market power will probably be fully mitigated by open access, also argues that the Commission should examine generation dominance on a region-by- region basis. 136/ Montana-Dakota Utilities argues that the Commission should allow all suppliers in a power pool or RTG to have market-based rates after a Commission finding that there is sufficient generation competition within the region.
Duke states that it would be highly inconsistent for the Commission to require open access, but not allow utilities to compete in the market. It further states that the relevant market should be determined using standard antitrust techniques; the Commission should examine the options available to customers and determine whether the utility possesses monopoly power in a relevant market.
Many commenters are concerned that even with open access tariffs certain generators will be able to exercise market dominance. 137/ For example, NARUC argues that utilities retain market power through their ownership of existing generation and transmission facilities, favorable long-term contracts for fuel and other inputs, and access to superior generation sites. 138/ NRECA believes that the universe of generation providers is still too narrow to assume a competitive market and that other factors, such as transmission constraints and pancaking of rates, will inhibit the development of competitive markets. 139/ FTC says that, although comparable transmission access could broaden the relevant geographic market for generation, the Commission should not assume that there will be no market power. It says that the Commission must continue to evaluate each case. 140/ TDU Systems argues that the Commission cannot move to market-based rates without a Congressional determination that deregulation of wholesale electric rates should be implemented. It further asserts that the Commission does not have a factual basis for a reasoned conclusion that regulated utilities do not have market dominance -- full open access is only a goal at this time, and the success of open access will depend upon the transmission rate structures the Commission approves.
LEPA raises concerns that the small bulk power suppliers, QFs, co-generators, EWGs, IPPs, and marketers (who provide non- requirements power) may not be able to bring competition to the wholesale market. LEPA concludes that "barriers will exist unless buyers have full access to requirements power itself, rather than just to the chance to acquire the individual components of requirements power." 141/ TDU Systems raises concerns about the limited number of generation providers and the effect of possible future mergers. It also argues that pancaked rates raise the cost of transmission to third parties, thereby restricting the geographic scope of markets. As a result, TDU Systems asserts that individual generators in highly concentrated regions will still be able to exert market power. OH Com expresses concerns that restrictions on siting of generation and transmission will favor nearby generators. SC Public Service Authority argues that if the Commission allows utilities to recover stranded costs their market power will not be mitigated, since customers will have to pay exit fees to switch suppliers. 142/
CCEM notes that in Order No. 636 gas pipelines were not allowed market-based rates for merchant sales until after transmission had been completely unbundled and non-discriminatory open access had been fully implemented.
DOE and DOJ assert that open access should not be assumed to mitigate market power sufficiently to justify deregulation of existing generation -- structural changes, such as control of the regional grid by an independent entity, are required. DOE requests that the Commission continue to look for affiliate abuse when reviewing market-based rates for new generation. Similarly, EPA is concerned that even with open access, individual generators may still exert market power by their domination of a particular geographic market. It is also concerned that low-cost plants that are subject to weaker environmental standards could have a market advantage. NEPOOL Review Committee requests that the Commission not approve any market prices "where the market into which the seller proposes to sell is not effectively competitive due to the absence of regional transmission products and prices." 143/
While the Commission expects this Rule to facilitate the development of competitive bulk power markets, we find that there is not enough evidence on the record to make a generic determination about whether market power may exist for sales from existing generation. We continue to have concerns about how to define the relevant markets and believe that a more rigorous analysis is needed than can be achieved with the limited market data that is now available. We will continue our case-by-case approach that allows market-based rates based on an analysis of generation market power in first tier and second tier markets. 144/ In particular cases, however, the effect of the mandatory open access prescribed by this Final Rule may lead to the consideration of geographic markets for the applicant's generation products that are broader in scope than the first-tier and second-tier markets currently considered. 145/ By the same token, in some cases, evidence of the effects of transmission constraints may circumscribe the scope of the relevant geographic market for the applicant's generation products.
While we will continue to apply the first-tier/second-tier analysis, we will allow applicants and intervenors to challenge the presumption implicit in the Commission's practice that the relevant geographic market is bounded by the second-tier utilities. Thus, for instance, applicants may present evidence that the relevant market is in fact broader than the first or second tier. In support of such a contention, an applicant would need to show more than the existence of open access. For example, an applicant might attempt to demonstrate the lack of significant transmission constraints in the more broadly defined market and that cumulative transmission rates would not significantly affect the ability of more distant suppliers to compete in the relevant market. Similarly, an intervenor may present evidence that, due to the existence of significant transmission constraints within the first- and second-tier markets, the relevant market is in fact more limited in scope. 146/
Finally, we will maintain our current practice of allowing market-based rates for existing generation to go into effect subject to refund. To the extent that either the applicant or intervenors in individual cases offer specific evidence that the relevant geographic market ought to be defined differently than under the existing test, we will examine such arguments through formal or paper hearings.
Because our goal is to develop more competitive bulk power markets, we will continue to monitor markets to assess the competitiveness of the market in existing generation, and we will modify our market rate criteria if and when appropriate. However, any changes we might make to our analysis for authorizing market-based rates in the future will not upset transactions entered into pursuant to existing market-based rate authority. The policies we put in place today to develop a smoothly functioning transmission access regime will provide useful experience and information for assessing the effects of generation concentration.
In the NOPR, the Commission did not address possible ramifications of the NOPR with regard to its existing merger policy.
A number of commenters suggest that the Commission should reevaluate its merger policy in light of the NOPR. 147/ They further suggest a number of changes that they believe need to be made to the Commission's existing merger policy.
Most commenters raising this issue express concerns that mergers will lessen competition and hinder achievement of competitive bulk power markets. 148/ For example, NRECA indicates that the Commission's merger policy is at a crossroads. It believes that it is essential for the Commission to reevaluate its merger policy in concert with the proposed rulemakings. 149/ Similarly, TAPS recommends that the Commission reevaluate its merger criteria to ensure that in a more competitive era, mergers are found to be consistent with the public interest only if they are pro-competitive. Several commenters argue that the Commission should continue to conduct a case-by-case investigation of the product and geographic markets that will be affected by a proposed merger. 150/
A number of commenters also suggest certain changes that they would like to see in the Commission's merger policy. 151/ APPA recommends that, at a minimum, all merger approvals considered by the Commission should be conditioned on: (1) filing an open access transmission tariff, (2) demonstrating no market power in generation or ancillary services, and (3) granting all existing requirements customers of the merged entity the right to convert existing contracts to rights to equivalent transmission capacity. Several commenters suggest adopting the U.S. Department of Justice Merger Guidelines in analyzing merger proposals. 152/
Environmental Action and others contend that merging utilities must be required to demonstrate real net benefits to retail and wholesale customers that could not otherwise be achieved but for the proposed merger. 153/
Commenters also argue that the Commission should use its merger conditioning authority to order divestiture of transmission and generation when required to ensure competition. 154/ Environmental Action and NEPOOL Review Committee suggest conditioning merger applications on the existence of regional transmission pricing arrangements to mitigate any generation market power gained by the merging entities.
The Commission appreciates the concerns and suggestions raised with respect to our merger policy. However, since the time the NOPR was issued (and comments received thereon), we issued a Notice of Inquiry on the Commission's merger policy in Docket No. RM96-6-000. 155/ There we indicated that we will review whether our criteria and policies for evaluating mergers need to be modified in light of the changing circumstances, including this final rule, that are occurring in the electric industry. The NOI proceeding will permit us to consider comments from all interested participants and, at the same time, allow us to review our merger criteria and policies in light of this final rule. We are committed to reviewing our merger policy in a timely manner in the ongoing NOI proceeding. 156/
In the NOPR, the Commission explained that it believed that it could remedy unduly discriminatory practices and achieve more competitive bulk power markets without abrogating existing wholesale power supply contracts that bundle generation and transmission services and existing wholesale transmission contracts. 157/ Thus, we proposed to apply the functional unbundling requirement only to transmission services under new requirements contracts, new coordination contracts, and new transactions under existing coordination contracts. However, the Commission did invite comment on whether it would be contrary to the public interest to allow all or some of the above types of existing contracts to remain in effect.
Many of the commenters (including utility customers and third-party power suppliers) addressing this issue oppose abrogating existing contracts on a generic basis. 158/ A number of the commenters contend that existing contracts should be retained because they are the result of mutually beneficial bargaining. 159/ SMUD and TANC are concerned that existing contracts providing for transmission service that is superior to the pro forma tariffs not be abrogated. 160/ Ohio Edison argues that existing contracts have contributed to the emergence of competition, meet the specific needs of the parties, have been approved by the Commission, and have not been found to be unduly discriminatory or violative of the public interest, and that their preservation is consistent with the Energy Policy Act, most notably amended section 211 of the FPA. PacifiCorp and AEP express concern that contract abrogation would create competitive instability. American Forest & Paper argues that the Commission cannot refuse to honor existing contracts if it expects a competitive bulk power market to emerge.
Numerous commenters further argue that contract abrogation requires a fact-based, contract-specific evaluation, and they oppose any generic declaration that existing contracts are contrary to the public interest. 161/ Some suggest that generic contract abrogation cannot be justified under the public interest standard. 162/
Missouri Basin MPA argues that the Commission should allow abrogation of existing wholesale power and transmission arrangements if the customer can demonstrate the undue competitive disadvantage caused by the arrangement.
A few commenters support some form of generic contract abrogation. 163/ CCEM asserts that existing wholesale requirements customers must be given the right to convert to transmission service under non-discriminatory open access tariffs. 164/ CCEM notes that this is the same relief from undue discrimination that the Commission afforded to pipeline customers in Order Nos. 436 and 500. 165/ CCEM emphasizes that here, in contrast to what occurred in the gas industry, "[c]onversion rights should be understood as the logical quid pro quo for introducing extra-contractual stranded-cost recovery rights into the wholesale requirements contracts of electric utilities." 166/ NRECA asserts that it would be unduly discriminatory to allow new transmission customers to use the open access transmission tariffs, but not allow existing customers the same access. 167/
TAPS says that if those who now have discriminatory contracts are forced to live with those contracts, a fully competitive market will be delayed considerably. 168/ Moreover, TAPS argues, the Commission has a statutory duty to remedy the undue discrimination that it is only now recognizing. Even if the Commission will not abrogate these contracts across the board, TAPS asserts that we should use our section 206 authority to do so on a contract-by-contract basis.
San Francisco requests that the Commission clarify that a holder of capacity rights under an existing contract can extend contractual rights to transmission access at least coterminous with the life of the project and under a roll-over or renewal contract on the same basis as provided in the existing contract. Anoka EC proposes that when a wholesale purchaser's contract expires, it should have a right of first refusal to contract for the transmission capacity to which it previously had a right. Knoxville urges the Commission to require renegotiation of the notice and/or term of all existing contracts for which the voluntary termination period exceeds the time frame for implementation of the final rule.
NEPCO suggests that we require existing power contracts that allow rate changes to be separated into their generation and transmission components, without otherwise disturbing their terms; this would allow comparisons between the transmission service the utility provides to its power customers and the service it offers to others. 169/
CINergy argues that coordination agreements should not be excluded from the comparability standard and that the Commission should use its authority under section 206 to require amendments to such agreements, just as it did in Order 636 in requiring unbundling of pipeline supply contracts. CINergy suggests that public utilities should be given up to three years to file the amendments to avoid hardship on the industry and the Commission's staff. CINergy further asserts that future transactions conducted under coordination agreements should be unbundled and the transmission component subjected to the comparable transmission service requirement.
Others argue that purchases under existing coordination agreements made on behalf of retail native load should not be unbundled. 170/ NY Com and IL Com recommend that proposed section 35.28(c) be modified to state that the functional unbundling requirement "exclude[s] those wholesale purchases made by the utility to serve existing or expected native retail load."
Utilities For Improved Transition disagrees with the idea that new transactions under existing coordination agreements should be subject to the rule. 171/ It argues that the sanctity of coordination contracts should be the same as for other contracts. Coordination contracts are not simply agreements to agree in the future, according to Utilities For Improved Transition; they set forth terms and rates and merely leave the timing of transactions to be resolved in the future. Moreover, it argues that the Commission has given no reason to abandon its practice of encouraging coordination sales by allowing price flexibility.
We do not believe it is appropriate to order generic abrogation of existing requirements and transmission contracts. While the Commission did generically find it appropriate to modify natural gas contracts to complete the move to a competitive commodity market in natural gas, we face a different situation here. At the time the Commission addressed this situation in the natural gas industry, it was faced with shrinking natural gas markets, statutory escalations in natural gas ceiling prices under the Natural Gas Policy Act, and increased production of gas. 172/ In other words, there was a market failure in the industry that required the extraordinary measure of generically allowing all customers to break their contracts with pipelines.
In contrast, there is no such market failure in the electric industry. Although changes in the industry have been and continue to be dramatic, we do not believe they compel generic abrogation of requirements and transmission contracts. 173/
While we have concluded that current conditions in the wholesale power market do not warrant the generic modification of requirements contracts, we conclude nonetheless that the modification of certain requirements contracts on a case-by-case basis may be appropriate. We conclude further that, even if customers under such contracts are bound by so-called Mobile- Sierra clauses, they nonetheless ought to have the opportunity to demonstrate that their contracts no longer are just and reasonable.
The Commission finds that it would be against the public interest to permit a Mobile-Sierra clause in an existing wholesale requirements contract to preclude the parties to such a contract from the opportunity to realize the benefits of the competitive wholesale power markets. For purposes of this finding, the Commission defines existing requirements contracts as contracts executed on or before July 11, 1994. 174/ By operation of this finding, a party to a requirements contract containing a Mobile-Sierra clause no longer will have the burden of establishing independently that it is in the public interest to permit the modification of such contract. The party, however, still will have the burden of establishing that such contract no longer is just and reasonable and therefore ought to be modified.
This finding complements the Commission's finding that, notwithstanding a Mobile-Sierra clause in an existing requirements contract, it is in the public interest to permit amendments to add stranded cost provisions to such contracts if the public utility proposing the amendment can meet the evidentiary requirements of this Rule. 175/ The Commission's complementary Mobile-Sierra findings are not mutually exclusive. Any contract modification approved under this Section shall provide for the utility's recovery of any costs stranded consistent with the contract modification. The stranded costs must be prudently incurred, legitimate and verifiable, as provided in Section IV.J. Further, the Commission has concluded that if a customer is permitted to argue for modification of existing contracts that are less favorable to it than other generation alternatives, then the utility should be able to seek modification of contracts that may be beneficial to the customer.
The Commission believes that the most productive way to analyze contract modification issues is to consider simultaneously both the selling public utility's claims, if any, that it had a reasonable expectation of continuing to serve the customer beyond the term of the contract and the customer's claim, if any, that the contract no longer is just and reasonable and therefore ought to be modified. Thus, if the selling public utility intends to claim stranded costs, it must present that claim in any section 206 proceeding brought by the customer to shorten or terminate the contract. Similarly, if the customer intends to claim that the notice or termination provision of its existing requirements contract is unjust and unreasonable, it must present that claim in any proceeding brought by the selling public utility to seek recovery of stranded costs. This will promote administrative efficiency and will permit the Commission to consider how the contracting parties' claims bear on one another.
The Commission does not take contract modification lightly. Whether a utility is seeking a contract amendment to permit stranded cost recovery based on expectations beyond the stated term of the contract, or a customer is seeking to shorten or eliminate the term of an existing contract, we believe that each has a heavy burden in demonstrating that the contract ought to be modified. Still, we believe that given the industry circumstances now facing us, both selling utilities and their customers ought to have an opportunity to make the case that their existing requirements contracts ought to be modified. By providing both buyers and sellers this opportunity, the Commission attempts to strike a reasonable balance of the interests of all market participants. The Commission expects that many of the arguments presented by buyers and sellers in such proceedings will be fact specific.
We note that because we are not abrogating existing requirements and transmission contracts generically and because the functional unbundling requirement of the Final Rule applies only to new wholesale services, the terms and conditions of the Final Rule pro forma tariff do not apply to service under existing requirements contracts. However, if a customer's existing bundled service (transmission and generation) contract or transmission-only contract expires, and the customer takes any new transmission service from its former supplier, the terms and conditions of the Final Rule tariff would then apply to the transmission service that the customer receives.
A further issue concerning firm contract customers is their right to transmission capacity (and the rate for such capacity) when their contracts expire by their own terms or become subject to renewal or rollover. We have concluded that all firm transmission customers (requirements and transmission-only), upon the expiration of their contracts or at the time their contracts become subject to renewal or rollover, should have the right to continue to take transmission service from their existing transmission provider. The limitations are that the underlying contract must have been for a term of one-year or more and the existing customer must agree to match the rate offered by another potential customer, up to the transmission provider's maximum filed transmission rate at that time, and to accept a contract term at least as long as that offered by the potential customer.
This means that there is no right to grandfather the historical price of the transmission service. Thus, if not enough capacity is available to meet all requests for service, the right of first refusal gives the capacity to the existing customer who had contractually been using the capacity on a long- term, firm basis, assuming that it meets the conditions set forth above. Moreover, this limited right of first refusal is not a one-time right of first refusal for contracts existing as of the date of the final rule, but is an ongoing right that may be exercised at the end of all firm contract (including all future unbundled transmission contracts) terms. A customer converting existing bundled service to the Final Rule pro forma tariff would not have a reservation priority for capacity expansions, unless the existing contract provides for future transmission to the customer that requires capacity expansion. 177/
Finally, with respect to all existing requirements contracts and tariffs that provide for bundled rates, we will require all public utilities to make informational filings setting forth the unbundled power and transmission rates reflected in contracts and tariffs. These informational rates must be submitted to the Commission within 60 days of publication of the Final Rule in the Federal Register and must also be included as a line item on all bills submitted to wholesale customers in the third month following the effective date of this final rule. The unbundled informational rates will permit wholesale customers to compare rates in anticipation of their contracts expiring so that they can evaluate alternative contracts.
The situation as to coordination agreements requires a slightly different approach. 178/ While we also believe that as a general matter it is important not to generically abrogate any coordination agreements, this is particularly true for non- economy energy coordination agreements that may reflect complementary long-term obligations among the parties. This type of agreement presents special problems and, as discussed below, we will not generically require this type of coordination agreement to be modified. 179/
Hundreds of coordination agreements exist in the industry today. Many are open-ended agreements that permit new transactions to occur well into the future. Because these contracts may not expire of their own terms in a reasonable time, they may present a larger and more enduring obstacle to non- discriminatory open access and more competitive bulk power markets. Thus, to assure that non-discriminatory open access becomes a reality in the relatively near future, we will partially modify existing economy energy coordination agreements. We will condition future sales and purchase transactions under existing economy energy coordination agreements 180/ to require that the transmission service associated with those transactions be provided pursuant to this Rule's requirements of non-discriminatory open access, no later than December 31, 1996. 181/ We also will require that for new economy energy coordination agreements 182/ where the transmission owner uses its transmission system to make economy energy sales or purchases, the transmission owner must take such service under its own transmission tariff as of the date trading begins under the agreement. 183/
Finally, we will treat non-economy energy coordination agreements differently. We will not require their modification. However, this does not insulate such agreements from complaints that transmission service provided under such agreements be provided pursuant to the Final Rule pro forma tariff.
With respect to coordination pricing practices, we conclude that non-discriminatory open access consistent with the requirements of this Rule is necessary if we are to allow utilities to continue to use market-driven pricing, such as split-the-savings pricing, for coordination sales. Absent such non-discriminatory open access, a utility would be able to deny access to others so as to obtain a higher price for its own power sales.
In the NOPR, the Commission discussed the procedures to be used in establishing Stage One rates. These Stage One rates were proposed as an administrative convenience. The proposal merely followed the long-established practice of establishing rates on the basis of contract path pricing. 184/ The Commission made no determination with respect to the appropriateness of flow- based pricing or contracting for other purposes. 185/
Most of the commenters addressing this issue recommend that industry or the Commission -- either in this rule or ultimately -- dispense with the traditional contract path basis for pricing and contracting. Most commenters also recommend that the Commission adopt or encourage a regional approach to the solution of transmission pricing problems, though they differ markedly in how to account for flows. 186/
Transmission customers generally seek to rid themselves of "pancaked" transmission rates that are associated with the traditional approach to transmission pricing. 187/ They propose the development of regionwide transmission rates, perhaps determined on a pool or RTG basis. Most, however, do not discuss how to account for unscheduled flows. 188/
Many transmission providers, some regulatory authorities, and some individuals strongly support flow-based pricing. Most of these commenters recognize a need for a regional approach to resolve transmission pricing concerns. 189/ However, many of them also appear to accept contract pricing in the near term because of the need to implement open access quickly. 190/ NERC recommends that the Commission maintain an open position on the transfer scheduling process and supports changes in the process to reflect actual power flows. EEI suggests that the Commission should be willing to deviate from a contract path approach, since competition may be accompanied by greater unscheduled flows and contract pricing is not well equipped to deal with such flows. However, EEI concludes that a single approach to pricing will not be appropriate for all systems.
Other commenters, however, do raise concerns with respect to flow-based pricing. AEC & SMEPA considers flow-based pricing to be flawed because that method makes an individual customer responsible for load flow effects caused by a third party's development of the third-party's transmission system over which the customer and its transmission provider had no control. Dayton P&L fears that competition would be lessened under flow- based pricing because utilities with large transmission systems would dominate the market.
Several commenters oppose Southern's and United Illuminating's flow-based proposals, arguing that the methodologies are based on estimates of actual flows or a set of conditions with limited applicability. Various commenters also believe that a single rate is flawed and could cause just as many problems as contract path pricing. 191/
Most commenters appear to believe that the Commission endorsed contract path pricing in the NOPR. Hogan expresses concern that many industry participants' understanding of the pro forma tariffs is based on the fiction of the contract path. The MT Dept of Environmental Quality believes that despite the Commission's pledge to consider innovative pricing proposals, 192/ such proposals will receive heavy scrutiny, while conventional contract path pricing proposals will receive nearly automatic approval. Dominion is concerned that relying on the initiative of individual transmission owners to develop flow- based pricing will yield slow and patchy results.
We will not, at this time, require that flow-based pricing and contracting be used in the electric industry. In reaching this conclusion, we recognize that there may be difficulties in using a traditional contract path approach in a non- discriminatory open access transmission environment, as described by Hogan and others. At the same time, however, contract path pricing and contracting is the longstanding approach used in the electric industry and it is the approach familiar to all participants in the industry. To require now a dramatic overhaul of the traditional approach -- such as a shift to some form of flow-based pricing and contracting -- could severely slow, if not derail for some time, the move to open access and more competitive wholesale bulk power markets. In addition, we believe it is premature for the Commission to impose generically a new pricing regime without the benefit of any experience with such pricing. We welcome new and innovative proposals, but we will not impose them in this Rule.
While we are not requiring the use of any form of flow-based pricing, we recognize that some versions of flow-based pricing could have benefits. For example, some versions of flow-based pricing could more accurately reflect and price the actual power flows on transmission systems and thus could produce efficiency gains, better generation siting decisions, and benefits for customers and utilities alike. Other versions could more accurately assign capacity rights in accordance with a party's contribution to capacity costs.
These potential benefits, however, will not simply come about in the abstract. Flow-based pricing methodologies that will achieve the benefits sought by most of the participants in the industry are in a development stage and require further work and refinement to address some of the difficulties associated with flow-based approaches. Concurrent work on OASIS and resolving available transmission capability issues may help resolve flow-based issues. However, as demonstrated by the paucity of possible methodologies presented in the comments, developing workable methodologies will be difficult. As we explained in our Transmission Pricing Policy Statement, we are receptive to proposals for alternative rate methodologies, such as distance-sensitive and flow-based pricing, as long as the proposals are well supported. However, we have yet to receive a formal rate application for a flow-based pricing methodology that has been tested enough that it can be required on a generic basis. Thus, we have decided to go forward to achieve open access and more competitive wholesale bulk power markets without waiting for the development of a generic flow-based pricing methodology.
We wish to emphasize further that in taking this approach we are not endorsing the traditional contract path approach as the only available approach. We continue to approve contract path pricing because it is the long-established pricing method that comes to us in rate filings by the electric industry, is administratively convenient and feasible, and thus is a practical way to move forward now. We remain open to alternative methodologies, but need to see better developed approaches from the industry before we can consider generic adoption of alternative pricing.
We also believe the adoption of flow-based pricing will be more practical on a regional, instead of individual utility, basis. Some forms of flow-based pricing may even require a regional approach. To this extent, regional ISOs could be a valuable mechanism for implementing such pricing reforms.

Convergence Research - 5/2/96